
EPC · 7 min read
EPC pass-through and the contractor tech gap
Why mid-tier contractors operating under EPC inherit operational complexity their toolkit was never built for — and where the unowned middle of the LATAM software market sits.
2026-05-06

Field notes
Short, technical posts about the operational layer where Excel breaks and ERPs don't reach. EPC, valorización, dotación, SSOMA, multi-cliente — what we've learned shipping software in the field.

EPC · 7 min read
Why mid-tier contractors operating under EPC inherit operational complexity their toolkit was never built for — and where the unowned middle of the LATAM software market sits.
2026-05-06

Valorización · 6 min read
A 5-day delay in the valorización cycle of a 5,000-worker contract under Anglo SAP can absorb a month of operating cash. The hidden cost of mapping every client format manually.
2026-05-04

Roster · 5 min read
Excel scales linearly with formula complexity, then collapses. The exact inflection point we see across mining and construction contractors is somewhere between 3,500 and 4,500 colaboradores per project.
2026-05-02
30 minutes with a solution architect. No pitch deck. We come with cases similar to yours.
Book a discovery callWe use cookies to keep the site running and to understand how it's used. You can accept all, reject non-essential, or customize. Read our Privacy Policy →