Where we have shipped — repeatedly.

Capabilities

These are not features in a SaaS catalog. They're operational verbs we've turned into production software, between 7 and 14 times each, across the contractors that operate under EPC pass-through in mining, construction, and energy.

01 / 09

Operations & Field Execution

Control de Producción y Avance · Control de Perforación · Control Operativo y de Costos

02 / 09

Equipment & Maintenance

Master de Equipos · Mantenimiento Correctivo y Preventivo

Accelerators reused

Master de Equipos11× · 6-8w
Mantenimiento Correctivo y Preventivo9× · 6-10w

Deployed in

CUMBRA · Quellaveco

Operations digitalization for one of LATAM's largest copper projects

42,943

man-hours digitalized

Sigdo Koppers · Toromocho

Loss prevention on PPE — at 117,200 tons of mineral per day

26.93%

PPE consumption savings

JJC · Tambomayo

Tailings filtration plant at altitude — 31% PPE savings on a S/. 2.2M budget

31.08%

PPE consumption savings

MDH · Mina Justa

Underground PPE traceability — every specialized item, digitally signed

S/. 614,997

in PPE savings

CUMBRA · Mina Justa — Oxide Plant & VATs

Oxide Plant construction at Mina Justa — S/. 1.94M saved across 12 months of digital PPE + warehouse logistics

S/. 1.94M

total operational savings (12 months)

Canal de Panamá · Gestión Digital de Activos Estratégicos

Strategic asset management for one of the world's most critical infrastructure operators

45–60 days

pilot to production

CUMBRA · Línea Amarilla — Lima Expressway

14 km of urban expressway across Lima — and 174,471 PPE deliveries that no longer required a worker to walk 45 minutes to the warehouse

S/. 1.93M

in process automation savings

JJC · Jarosita — Mining Services Scope

JJC's mining-services scope at the Jarosita operation — same Loss Prevention methodology, parallel result

31.08%

PPE consumption savings

CUMBRA · SEDAPAL — Water + Sanitation Infrastructure

Lima's public water utility, CUMBRA contracting, 1,653 workers at peak — and a 30% target PPE saving baked into the contract before day one

S/. 790K

projected PPE savings (9 months)

OHL · Antamina — Inventory Management

Inventory management at one of the world's largest polymetallic mines — same Logística Digital methodology proven at Mina Justa, re-deployed for OHL at Antamina

Same stack

Logística Digital methodology proven at Mina Justa

03 / 09

People & Welfare

Tareo y Asistencia · Reclutamiento, Acreditación y Selección · Roster Digital · Capacitación

04 / 09

Camp & Site Services

Alojamiento · Alimentación · Transporte

Accelerators reused

Alojamiento9× · 4-6w
Alimentación12× · 4-6w
Transporte8× · 6-8w

05 / 09

Contractor & Supplier Management

Wallet Digital · Pases QR · Workflow de acreditación multi-área · Vigencia documental

06 / 09

Logistics & Supply

Almacén · Logística

Accelerators reused

Almacén13× · 6-10w
Logística10× · 8-10w

Deployed in

CUMBRA · Quellaveco

Operations digitalization for one of LATAM's largest copper projects

42,943

man-hours digitalized

Sigdo Koppers · Toromocho

Loss prevention on PPE — at 117,200 tons of mineral per day

26.93%

PPE consumption savings

JJC · Tambomayo

Tailings filtration plant at altitude — 31% PPE savings on a S/. 2.2M budget

31.08%

PPE consumption savings

MDH · Mina Justa

Underground PPE traceability — every specialized item, digitally signed

S/. 614,997

in PPE savings

CUMBRA · Mina Justa — Oxide Plant & VATs

Oxide Plant construction at Mina Justa — S/. 1.94M saved across 12 months of digital PPE + warehouse logistics

S/. 1.94M

total operational savings (12 months)

Canal de Panamá · Gestión Digital de Activos Estratégicos

Strategic asset management for one of the world's most critical infrastructure operators

45–60 days

pilot to production

CUMBRA · Línea Amarilla — Lima Expressway

14 km of urban expressway across Lima — and 174,471 PPE deliveries that no longer required a worker to walk 45 minutes to the warehouse

S/. 1.93M

in process automation savings

JJC · Jarosita — Mining Services Scope

JJC's mining-services scope at the Jarosita operation — same Loss Prevention methodology, parallel result

31.08%

PPE consumption savings

CUMBRA · SEDAPAL — Water + Sanitation Infrastructure

Lima's public water utility, CUMBRA contracting, 1,653 workers at peak — and a 30% target PPE saving baked into the contract before day one

S/. 790K

projected PPE savings (9 months)

OHL · Antamina — Inventory Management

Inventory management at one of the world's largest polymetallic mines — same Logística Digital methodology proven at Mina Justa, re-deployed for OHL at Antamina

Same stack

Logística Digital methodology proven at Mina Justa

07 / 09

Commercial & Valorización

Valorización Cliente · Valorización Contratista

Accelerators reused

Valorización Cliente11× · 8-12w
Valorización Contratista14× · 8-12w

Deployed in

Public references coming. Selected deployments available under NDA on a discovery call.

08 / 09

Planning & Project Controls

Tags & Forecast · Programación Diaria · Reporte de Avance Cliente · Planeamiento · Costos

Accelerators reused

Tags & Forecast6× · 8-12w
Programación Diaria7× · 6-10w
Reporte de Avance Cliente8× · 10-14w
Planeamiento6× · 10-14w
Costos7× · 10-14w

Deployed in

Public references coming. Selected deployments available under NDA on a discovery call.

09 / 09

Compliance & Safety

SSOMA · ISO 45001 · SUNAFIL / NOM / DS594

Also available as a product

Deployed in

CUMBRA · Quellaveco

Operations digitalization for one of LATAM's largest copper projects

42,943

man-hours digitalized

Sigdo Koppers · Toromocho

Loss prevention on PPE — at 117,200 tons of mineral per day

26.93%

PPE consumption savings

JJC · Tambomayo

Tailings filtration plant at altitude — 31% PPE savings on a S/. 2.2M budget

31.08%

PPE consumption savings

MDH · Mina Justa

Underground PPE traceability — every specialized item, digitally signed

S/. 614,997

in PPE savings

UNNA Energía · UNNA Digital

HSE + RRHH + CAMO digital, deployed across an integrated hydrocarbons operator

4 weeks

to production per module

CUMBRA · Mina Justa — Oxide Plant & VATs

Oxide Plant construction at Mina Justa — S/. 1.94M saved across 12 months of digital PPE + warehouse logistics

S/. 1.94M

total operational savings (12 months)

Canal de Panamá · Gestión Digital de Activos Estratégicos

Strategic asset management for one of the world's most critical infrastructure operators

45–60 days

pilot to production

CUMBRA · Línea Amarilla — Lima Expressway

14 km of urban expressway across Lima — and 174,471 PPE deliveries that no longer required a worker to walk 45 minutes to the warehouse

S/. 1.93M

in process automation savings

JJC · Jarosita — Mining Services Scope

JJC's mining-services scope at the Jarosita operation — same Loss Prevention methodology, parallel result

31.08%

PPE consumption savings

CUMBRA · SEDAPAL — Water + Sanitation Infrastructure

Lima's public water utility, CUMBRA contracting, 1,653 workers at peak — and a 30% target PPE saving baked into the contract before day one

S/. 790K

projected PPE savings (9 months)

OHL · Antamina — Inventory Management

Inventory management at one of the world's largest polymetallic mines — same Logística Digital methodology proven at Mina Justa, re-deployed for OHL at Antamina

Same stack

Logística Digital methodology proven at Mina Justa

How we work with you

Which one fits your case?

Three paths depending on what you need to solve, what systems you already have, and your timeline. Many of our clients combine more than one.

01 —

Custom Software

When your operation has its own processes that no product on the market covers — and you want a system that's yours, integrated, growing with you.

  • ·Your processes are particular to your company — they don't fit a standard product
  • ·You need to integrate several areas in one platform (operations, equipment, people, quality)
  • ·You want to work with professionals who already have real experience in your industry — mining, construction, energy. No learning curve at your project's expense
  • ·You need a team that understands the operational context (rotational shifts, EPC pass-through, contractor valorización, local regulation) — and speaks the vocabulary your people already use
  • ·You want the system to be your company's property, not a rental
  • ·You're ready for a formal project with timeline and a dedicated team
02 —

Logiflex Platforms

When your current system works, but you need to solve a specific area — fast, proven, connected to what you already have.

  • ·You have one concrete pain (contractor management, roster, IPERC) you want to solve with a proven product
  • ·It needs to connect to your SAP, Oracle or other ERP — we have APIs for that
  • ·You want implementation in weeks, not months
  • ·You prefer subscribing to a product already used by hundreds of clients across Latin America
  • ·Every platform comes with web + mobile app — one for office and supervisors, the other for the operator on site
03 —

Logiflex Apps

When the problem lives in the field and you need something the supervisor or operator can use today — without going through IT or procurement.

  • ·Your team on site needs a practical tool on their phone
  • ·You want to digitize field records (pre-use, IPERC, toolbox talks, daily report) that are still on paper
  • ·You need to start now — no corporate purchases, no per-site licensing
  • ·The apps connect to Microsoft Office, Google Workspace and other systems of yours via API — export, sync, don't re-type
  • ·The supervisor or operator is the one who decides and uses the tool directly

Tell us about your operational pain.

30 minutes with a solution architect. No pitch deck. We come with cases similar to yours.

Book a discovery call

We use cookies to keep the site running and to understand how it's used. You can accept all, reject non-essential, or customize. Read our Privacy Policy →