
Where we have shipped — repeatedly.
Capabilities
These are not features in a SaaS catalog. They're operational verbs we've turned into production software, between 7 and 14 times each, across the contractors that operate under EPC pass-through in mining, construction, and energy.
01 / 09
Operations & Field Execution
Control de Producción y Avance · Control de Perforación · Control Operativo y de Costos
Accelerators reused
Also available as a product
02 / 09
Equipment & Maintenance
Master de Equipos · Mantenimiento Correctivo y Preventivo
Accelerators reused
Deployed in
CUMBRA · Quellaveco
Operations digitalization for one of LATAM's largest copper projects
42,943
man-hours digitalized
Sigdo Koppers · Toromocho
Loss prevention on PPE — at 117,200 tons of mineral per day
26.93%
PPE consumption savings
JJC · Tambomayo
Tailings filtration plant at altitude — 31% PPE savings on a S/. 2.2M budget
31.08%
PPE consumption savings
MDH · Mina Justa
Underground PPE traceability — every specialized item, digitally signed
S/. 614,997
in PPE savings
CUMBRA · Mina Justa — Oxide Plant & VATs
Oxide Plant construction at Mina Justa — S/. 1.94M saved across 12 months of digital PPE + warehouse logistics
S/. 1.94M
total operational savings (12 months)
Canal de Panamá · Gestión Digital de Activos Estratégicos
Strategic asset management for one of the world's most critical infrastructure operators
45–60 days
pilot to production
CUMBRA · Línea Amarilla — Lima Expressway
14 km of urban expressway across Lima — and 174,471 PPE deliveries that no longer required a worker to walk 45 minutes to the warehouse
S/. 1.93M
in process automation savings
JJC · Jarosita — Mining Services Scope
JJC's mining-services scope at the Jarosita operation — same Loss Prevention methodology, parallel result
31.08%
PPE consumption savings
CUMBRA · SEDAPAL — Water + Sanitation Infrastructure
Lima's public water utility, CUMBRA contracting, 1,653 workers at peak — and a 30% target PPE saving baked into the contract before day one
S/. 790K
projected PPE savings (9 months)
OHL · Antamina — Inventory Management
Inventory management at one of the world's largest polymetallic mines — same Logística Digital methodology proven at Mina Justa, re-deployed for OHL at Antamina
Same stack
Logística Digital methodology proven at Mina Justa
03 / 09
People & Welfare
Tareo y Asistencia · Reclutamiento, Acreditación y Selección · Roster Digital · Capacitación
Accelerators reused
Also available as a product
Deployed in
CUMBRA · Quellaveco
Operations digitalization for one of LATAM's largest copper projects
42,943
man-hours digitalized
UNNA Energía · UNNA Digital
HSE + RRHH + CAMO digital, deployed across an integrated hydrocarbons operator
4 weeks
to production per module
CUMBRA · Línea Amarilla — Lima Expressway
14 km of urban expressway across Lima — and 174,471 PPE deliveries that no longer required a worker to walk 45 minutes to the warehouse
S/. 1.93M
in process automation savings
04 / 09
Camp & Site Services
Alojamiento · Alimentación · Transporte
Accelerators reused
05 / 09
Contractor & Supplier Management
Wallet Digital · Pases QR · Workflow de acreditación multi-área · Vigencia documental
Accelerators reused
Also available as a product
06 / 09
Logistics & Supply
Almacén · Logística
Accelerators reused
Deployed in
CUMBRA · Quellaveco
Operations digitalization for one of LATAM's largest copper projects
42,943
man-hours digitalized
Sigdo Koppers · Toromocho
Loss prevention on PPE — at 117,200 tons of mineral per day
26.93%
PPE consumption savings
JJC · Tambomayo
Tailings filtration plant at altitude — 31% PPE savings on a S/. 2.2M budget
31.08%
PPE consumption savings
MDH · Mina Justa
Underground PPE traceability — every specialized item, digitally signed
S/. 614,997
in PPE savings
CUMBRA · Mina Justa — Oxide Plant & VATs
Oxide Plant construction at Mina Justa — S/. 1.94M saved across 12 months of digital PPE + warehouse logistics
S/. 1.94M
total operational savings (12 months)
Canal de Panamá · Gestión Digital de Activos Estratégicos
Strategic asset management for one of the world's most critical infrastructure operators
45–60 days
pilot to production
CUMBRA · Línea Amarilla — Lima Expressway
14 km of urban expressway across Lima — and 174,471 PPE deliveries that no longer required a worker to walk 45 minutes to the warehouse
S/. 1.93M
in process automation savings
JJC · Jarosita — Mining Services Scope
JJC's mining-services scope at the Jarosita operation — same Loss Prevention methodology, parallel result
31.08%
PPE consumption savings
CUMBRA · SEDAPAL — Water + Sanitation Infrastructure
Lima's public water utility, CUMBRA contracting, 1,653 workers at peak — and a 30% target PPE saving baked into the contract before day one
S/. 790K
projected PPE savings (9 months)
OHL · Antamina — Inventory Management
Inventory management at one of the world's largest polymetallic mines — same Logística Digital methodology proven at Mina Justa, re-deployed for OHL at Antamina
Same stack
Logística Digital methodology proven at Mina Justa
07 / 09
Commercial & Valorización
Valorización Cliente · Valorización Contratista
Accelerators reused
Deployed in
Public references coming. Selected deployments available under NDA on a discovery call.
08 / 09
Planning & Project Controls
Tags & Forecast · Programación Diaria · Reporte de Avance Cliente · Planeamiento · Costos
Accelerators reused
Deployed in
Public references coming. Selected deployments available under NDA on a discovery call.
09 / 09
Compliance & Safety
SSOMA · ISO 45001 · SUNAFIL / NOM / DS594
Also available as a product
Deployed in
CUMBRA · Quellaveco
Operations digitalization for one of LATAM's largest copper projects
42,943
man-hours digitalized
Sigdo Koppers · Toromocho
Loss prevention on PPE — at 117,200 tons of mineral per day
26.93%
PPE consumption savings
JJC · Tambomayo
Tailings filtration plant at altitude — 31% PPE savings on a S/. 2.2M budget
31.08%
PPE consumption savings
MDH · Mina Justa
Underground PPE traceability — every specialized item, digitally signed
S/. 614,997
in PPE savings
UNNA Energía · UNNA Digital
HSE + RRHH + CAMO digital, deployed across an integrated hydrocarbons operator
4 weeks
to production per module
CUMBRA · Mina Justa — Oxide Plant & VATs
Oxide Plant construction at Mina Justa — S/. 1.94M saved across 12 months of digital PPE + warehouse logistics
S/. 1.94M
total operational savings (12 months)
Canal de Panamá · Gestión Digital de Activos Estratégicos
Strategic asset management for one of the world's most critical infrastructure operators
45–60 days
pilot to production
CUMBRA · Línea Amarilla — Lima Expressway
14 km of urban expressway across Lima — and 174,471 PPE deliveries that no longer required a worker to walk 45 minutes to the warehouse
S/. 1.93M
in process automation savings
JJC · Jarosita — Mining Services Scope
JJC's mining-services scope at the Jarosita operation — same Loss Prevention methodology, parallel result
31.08%
PPE consumption savings
CUMBRA · SEDAPAL — Water + Sanitation Infrastructure
Lima's public water utility, CUMBRA contracting, 1,653 workers at peak — and a 30% target PPE saving baked into the contract before day one
S/. 790K
projected PPE savings (9 months)
OHL · Antamina — Inventory Management
Inventory management at one of the world's largest polymetallic mines — same Logística Digital methodology proven at Mina Justa, re-deployed for OHL at Antamina
Same stack
Logística Digital methodology proven at Mina Justa
How we work with you
Which one fits your case?
Three paths depending on what you need to solve, what systems you already have, and your timeline. Many of our clients combine more than one.
Custom Software
When your operation has its own processes that no product on the market covers — and you want a system that's yours, integrated, growing with you.
- ·Your processes are particular to your company — they don't fit a standard product
- ·You need to integrate several areas in one platform (operations, equipment, people, quality)
- ·You want to work with professionals who already have real experience in your industry — mining, construction, energy. No learning curve at your project's expense
- ·You need a team that understands the operational context (rotational shifts, EPC pass-through, contractor valorización, local regulation) — and speaks the vocabulary your people already use
- ·You want the system to be your company's property, not a rental
- ·You're ready for a formal project with timeline and a dedicated team
Logiflex Platforms
When your current system works, but you need to solve a specific area — fast, proven, connected to what you already have.
- ·You have one concrete pain (contractor management, roster, IPERC) you want to solve with a proven product
- ·It needs to connect to your SAP, Oracle or other ERP — we have APIs for that
- ·You want implementation in weeks, not months
- ·You prefer subscribing to a product already used by hundreds of clients across Latin America
- ·Every platform comes with web + mobile app — one for office and supervisors, the other for the operator on site
Logiflex Apps
When the problem lives in the field and you need something the supervisor or operator can use today — without going through IT or procurement.
- ·Your team on site needs a practical tool on their phone
- ·You want to digitize field records (pre-use, IPERC, toolbox talks, daily report) that are still on paper
- ·You need to start now — no corporate purchases, no per-site licensing
- ·The apps connect to Microsoft Office, Google Workspace and other systems of yours via API — export, sync, don't re-type
- ·The supervisor or operator is the one who decides and uses the tool directly
Tell us about your operational pain.
30 minutes with a solution architect. No pitch deck. We come with cases similar to yours.
Book a discovery call